Full Gut Renovation in NYC — MWBE-Certified General Contractor
Designs by D and J LLC is a MWBE-certified, NYC-licensed general contractor specializing in full gut renovations of apartments, co-ops, condos, townhouses, and brownstones throughout New York City — managing demolition through certificate of occupancy under one accountable design-build structure.
What Is a Full Gut Renovation?
A full gut renovation — also called a gut renovation or gut rehab — means stripping a space down to its structural elements: exposed studs, concrete slabs, and rough plumbing and electrical stubs. Everything else — walls, ceilings, flooring, kitchen, bathrooms, millwork, fixtures, and mechanical systems — is removed and rebuilt from scratch. It is the most comprehensive type of renovation, and it gives you the opportunity to completely redesign a space’s layout, update every system to code, and finish to exactly the standard you want.
In New York City, full gut renovations are common in older apartment buildings, pre-war co-ops and condos, brownstones, and commercial spaces where existing systems have reached the end of their useful life or the layout no longer serves the owner’s needs. NYC gut renovations require DOB permits, asbestos surveys for pre-1987 buildings, coordination with building management and co-op or condo boards, and adherence to strict NYC construction working-hour rules.
Full Gut Renovation Scope of Work
| Phase | Scope |
|---|---|
| Pre-construction | Asbestos survey, building alteration agreement, DOB permit filing, board approval package, site protection setup |
| Demolition | Full interior demo to studs/slab, debris removal, asbestos abatement (if required) |
| Structural | Wall removals with beam installation, floor openings (for duplex/combo), structural repairs |
| Rough plumbing | New drain lines, supply lines, riser connections, waste stack reconfiguration |
| Rough electrical | New panel, all new circuits, low-voltage rough-in (cable, data, A/V) |
| HVAC & mechanical | New ductwork or mini-split system, exhaust fans, in-unit heating |
| Insulation & drywall | Thermal and sound insulation, new drywall, skim coat or Level 5 finish |
| Kitchen installation | Cabinetry, countertops, tile backsplash, appliances, plumbing and electrical final |
| Bathroom installation | Tile, fixtures, vanity, shower/tub, plumbing and electrical final |
| Flooring | Hardwood (new or refinished), tile, stone, engineered wood |
| Millwork & trim | Baseboards, door casings, built-ins, closets, custom cabinetry |
| Paint & finish | Priming, full paint, specialty finishes |
| Final inspections | DOB inspections, sign-off, certificate of occupancy if required |
Full Gut Renovation Cost in NYC
| Space Type | Typical Cost Per Sq Ft | Example Total |
|---|---|---|
| Standard NYC apartment gut (mid-range finishes) | $250 – $350 / sq ft | $250,000 – $350,000 for 1,000 sq ft |
| NYC apartment gut (high-end finishes) | $350 – $450+ / sq ft | $350,000 – $450,000+ for 1,000 sq ft |
| Luxury NYC apartment gut | $550+ / sq ft | $550,000+ for 1,000 sq ft |
| Brownstone floor gut (owner-occupied) | $300 – $450+ / sq ft | $450,000 – $675,000+ for 1,500 sq ft |
| Full brownstone renovation | Project-specific | Often starts around $600,000; larger full-gut projects can run $1.2M – $1.8M+ |
| Commercial gut renovation | $80 – $200 / sq ft | Varies widely by use and finishes |
Cost drivers in NYC gut renovations include: building-specific requirements (working hours, elevator access, material staging), structural complexity, finish level, co-op or condo board restrictions, and current material and labor market conditions. Costs above reflect 2025–2026 NYC market ranges and are starting estimates — we provide detailed written proposals after a site walkthrough.
Full Gut Renovation Timeline in NYC
| Phase | Typical Duration |
|---|---|
| Design & planning | 4–10 weeks |
| Board approval (co-op/condo) | 4–12 weeks |
| DOB permit | 4–12 weeks (or faster with professional certification) |
| Demolition | 1–3 weeks |
| Rough trades (plumbing, electric, HVAC) | 4–8 weeks |
| Drywall & plaster | 2–4 weeks |
| Kitchen & bath installation | 4–8 weeks |
| Flooring, millwork, paint | 3–6 weeks |
| Final inspections & punch list | 2–4 weeks |
| Total construction (typical) | 16–36 weeks |
Why Choose Designs by D&J for Your NYC Gut Renovation
- MWBE-Certified — NYC Small Business Services certified Minority- and Women-Business Enterprise.
- Registered for NYC and NJ work — NYC General Contractor registration #623750 is held by Dominique Gabriel; NJ Home Improvement Contractor registration #13VH12888200. Fully insured.
- Design-Build Structure — One contract covers architects, engineers, interior designers, and construction. No gap between design and execution.
- DOB Permit Management — We file and manage all DOB permits, inspections, and final sign-offs.
- Co-op & Condo Board Experience — We prepare full alteration agreement packages and manage board relations throughout the project.
- Dedicated Project Manager — Every gut renovation gets a named project manager, weekly progress reports, and an open project management portal.
- Pre-war Building Expertise — We understand the specific conditions of NYC pre-war construction: cast-iron columns, plaster walls, knob-and-tube wiring, cast-iron drain lines, and building envelope issues.
Project Spotlight: Full Gut Renovation — 1,400 Sq Ft Co-op, Upper West Side
A 1940s pre-war co-op on the Upper West Side required a complete gut renovation following a significant water damage event. The project included full interior demolition, replacement of all cast-iron drain lines, new electrical service and panel, new kitchen with custom cabinetry and waterfall Calacatta marble countertop, two full bathroom renovations with floor-to-ceiling tile, oak hardwood flooring throughout, and Level 5 drywall finish in all rooms. Co-op board approval was obtained in 6 weeks. DOB Alt-2 permit was approved in 9 weeks via professional certification. Construction was completed in 22 weeks.
Full Gut Renovation FAQ
What does a full gut renovation include in an NYC apartment?
A full gut renovation in a NYC apartment typically includes: complete interior demolition to studs and concrete slab; asbestos survey and abatement (for pre-1987 buildings); new rough plumbing (drain lines, supply lines, riser connections); new electrical wiring and panel; new HVAC or through-wall AC system; new insulation; new drywall and plaster; new kitchen including cabinets, countertops, appliances, and backsplash; new bathrooms including tile, fixtures, and vanity; new flooring; millwork, trim, and closets; and paint. It also includes all DOB permits and inspections.
Do I need a permit for a gut renovation in NYC?
Yes. A full gut renovation in NYC requires a DOB permit — typically an Alteration Type 2 (Alt-2) for most residential gut renovations that don’t change the number of units. If the project involves a change in the number of dwelling units (such as an apartment combination), an Alt-1 permit is required. DOB inspections are required at rough plumbing, rough electrical, and final stages. We handle all permit filings and inspection scheduling as part of our project management scope.
How much does a gut renovation cost in NYC?
A full gut renovation of a standard NYC apartment commonly costs approximately $250–$450+ per square foot depending on finish level and building-specific conditions. For a typical 1,000 sq ft apartment, expect roughly $250,000–$450,000 or more. High-end luxury work can start around $550 per square foot. We provide detailed line-item estimates after a site walkthrough — no ballpark estimates without seeing the space and reviewing building requirements.
How long does a gut renovation take in a NYC co-op or condo?
From first design conversation to move-in, a NYC co-op or condo gut renovation typically takes 9–18 months. Construction itself runs 16–36 weeks. The longest pre-construction phases are co-op board approval (4–12 weeks) and DOB permit approval (4–12 weeks) — both of which we run in parallel wherever possible to compress the overall schedule. Building-specific working hour restrictions (typically 8am–5pm weekdays in most NYC co-ops) also affect construction duration.
Do I need an asbestos test before gutting my NYC apartment?
Yes, if your building was constructed before 1987. NYC law requires an asbestos survey by a licensed investigator before any demolition in buildings constructed or renovated before 1987. Asbestos is commonly found in floor tiles, pipe insulation, plaster, joint compound, and ceiling materials in pre-war and mid-century NYC buildings. If asbestos-containing materials are found, licensed abatement is required before demolition can proceed. We coordinate the asbestos survey and, if needed, the abatement contractor as part of our pre-construction process.
Get a Free Full Gut Renovation Estimate
Planning a gut renovation in New York City? Call Designs by D&J at (347) 688-6897, email info@designsbydandj.com, or use the form below. We offer free consultations and site walkthroughs for gut renovation projects throughout Brooklyn, Manhattan, Queens, the Bronx, and Staten Island.
See this in a real project
These recent full gut renovations include real budgets, timelines and permit details.
- Bed-Stuy Brownstone Full Gut Renovation: an 8–10 month full gut with DOB filing, new mechanicals and a restored original facade ($750K–$800K).
- Queens Village Full House Gut Remodel: a 3-month gut remodel finished to a fixed move-out date, with a curbless shower and heated bathroom floors ($250K–$350K).