Bathroom Remodeling in Brooklyn, Done by One Accountable Team
Brooklyn bathrooms are small, old, and unforgiving — cast-iron tubs, questionable plumbing, and tile hiding a century of surprises. Designs by D and J LLC is an owner-led, MWBE-certified design/build firm, which means one contract and one team accountable from design through final walkthrough. No designer-contractor finger-pointing, no mystery subs.
What Our Bathroom Renovations Include
• Full bathroom design with layout and fixture selections• Demolition and rough construction• Licensed plumbing and electrical, coordinated under our contract• Tub-to-shower conversions, including curbless and walk-in showers• Tile work: floors, shower surrounds, and accent walls• Vanities, toilets, and fixture installation• Waterproofing done to manufacturer spec — the part that matters most• Lighting, mirrors, and ventilation• Final detailing, punch list, and walkthrough
Tub-to-Shower Conversions
Our most requested bathroom project. We remove the old tub and build a proper walk-in or curbed shower with correct waterproofing, drainage, and tile — not a liner over the old tub. Typical timeline is 4–6 weeks depending on your building's alteration agreement and inspections, and pricing starts around $28,000.
How a Project Runs
1. Consultation. We assess the existing bathroom, talk through what you want, and flag building-specific constraints early. 2. Design and estimate. A clear design proposal with a line-item estimate — no allowances hiding the real number. 3. Preconstruction. Selections finalized, permits and alteration agreements handled, work scheduled. 4. Construction. One project team, one point of contact, with regular updates. 5. Walkthrough. We punch-list every detail before we call it done.
What Brooklyn Bathrooms Cost With Us
As a directional guide, recent full bathroom renovations with our firm have typically fallen in the $35,000–$40,000 range, and tub-to-shower conversions start around $28,000. Your written estimate will show exactly where your project lands and why.
Neighborhoods We Serve
Park Slope, Fort Greene, Brooklyn Heights, Williamsburg, Bushwick, Bed-Stuy, Crown Heights, Prospect Heights, Carroll Gardens, Cobble Hill, Bay Ridge, and neighborhoods across greater New York City.
Frequently Asked Questions
How long does a bathroom remodel take in Brooklyn?
Full bathroom renovations typically run 4–6 weeks of active construction. Tub-to-shower conversions fall in the same range, with the exact timeline depending on your building's alteration agreement and inspection scheduling.
Do you handle waterproofing properly?
Yes — and it's the most important part of the job. We waterproof to manufacturer specifications behind every shower and wet area, because a pretty tile job over bad waterproofing is a future insurance claim.
Do you work in co-ops and condos?
Yes. We prepare alteration agreements, coordinate with building management, and work within building rules and hours.
Can you convert my tub to a walk-in shower?
That's our specialty — see our tub-to-shower conversion page for the full breakdown.
Why design/build instead of hiring separately?
One firm owns the design and the build, so the estimate matches the drawings and the drawings match what's buildable in your space. Nobody to blame, nothing lost in translation.
Ready to talk about your bathroom? Call Designs by D and J LLC at (347) 688-6897 or request a consultation. We're at 147 Prince Street, Brooklyn, NY 11201.
